{"id":6589,"date":"2021-01-05T16:38:58","date_gmt":"2021-01-05T14:38:58","guid":{"rendered":"https:\/\/maresmecircular.cat\/?page_id=6589"},"modified":"2022-01-13T18:38:46","modified_gmt":"2022-01-13T16:38:46","slug":"maresme-integral-centre-for-waste-recovery","status":"publish","type":"page","link":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/","title":{"rendered":"Maresme Integral Centre For Waste Recovery"},"content":{"rendered":"

[vc_row css=”.vc_custom_1606749728342{margin-top: 30px !important;}”][vc_column]

\n\t\t\t\t

Definition of the project<\/span><\/h1>

Recently, the Consorci has promoted a series of actions financed by Generalitat de Catalunya which have led to the creation of the new Centre Integral de Valoritzaci\u00f3 de Residus del Maresme (Maresme Integrated Centre for Waste Recovery). This is a facility of reference and makes the Maresme area a leader in waste management.<\/p>\n<p>In fact, however, this is part of the third generation of facilities managed by the Consorci:<\/p><\/div>[\/vc_column][\/vc_row][vc_row][vc_column][vc_tta_accordion][vc_tta_section title=”First Generation: 1985″ tab_id=”1606749602157-29ba1da6-c08c”][vc_column_text]Due to the closure of the landfill in the city of Matar\u00f3 in the 80\u2019s, the city council was faced with the need to provide some alternative treatment system in order to solve the need to manage municipal waste.<\/p>\n

This is how Matar\u00f3 became the head of the Consorci per al Tractament de Residus S\u00f2lids Urbans del Maresme, which grouped together, in its first stage, 17 towns of the Maresme area plus the Diputaci\u00f3 de Barcelona.<\/p>\n

Technically, the chosen solution was the implementation of a Planta de Reciclatge i Compostatge (Recycling and Composting Plant), which was then a pioneering type of facility. The objective of the plant was to select the recoverable subproducts and to compost organic matter in order to market it as organic fertilizer \u2013compost\u2013.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=”Second Generation: 1994″ tab_id=”1606749602178-c0321abd-d6ee”][vc_column_text]At the same time, the Planta de Reciclatge i Compostatge started working, there was a period of strong economic growth, so that the generation of waste in the area increased 5% yearly between 1985 and 1990.<\/p>\n

These circumstances, together with the legislation and environmental awareness, contributed to the fact that most of the remaining towns in the Maresme area, as well as the Consell Comarcal del Maresme, applied for membership of the Consorci, which now was formed by 27 towns, plus the Diputaci\u00f3 de Barcelona and the Consell Comarcal del Maresme.<\/p>\n

This increase forced the enlargement of the plant\u2019s capacity and, at the same time, the solution of the operation issues encountered up to that moment.<\/p>\n

This is when the need to enable the energy recovery of the combustible fraction sent to the landfill up to then became obvious, and, therefore, the need to build the new Waste to Energy Plant.<\/p>\n

The combination of the existing Planta de Reciclatge i Compostatge, plus the newly built Planta Incineradora was called Centre Integral de Valoritzaci\u00f3 de Residus del Maresme (Maresme Integrated Centre for Wast Recovery) opened on November 12, 1994.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=”Third Generation: 2010″ tab_id=”1606749668476-ee283f8e-35b0″][vc_column_text]The new Centre Integral de Valoritzaci\u00f3 de Residus del Maresme is framed within the Pla territorial sectorial d\u2019infraestructures de gesti\u00f3 de residus municipals (Land sectorial plan of infrastructures for the management of municipal waste), approved by the decree Decret 16\/2010, of February 16, of Generalitat de Catalunya.<\/p>\n

The new Centre includes different facilities for waste treatment: a MBT plant for the mixed waste fraction (mixed waste still containing recoverable materials), a treatment line for bulky waste (sofas, furniture, etc.), transfer stations of the different fractions collected separately (organic matter, glass, packaging, and paper and cardboard), and the already existing facility of energy recovery with improvements. The Centre, therefore, ensures the maximum reclamation and recovery of the municipal waste in the Maresme area.[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][\/vc_row][vc_row css=”.vc_custom_1606759191427{margin-top: 20px !important;}”][vc_column]

\n\t\t\t\t

The concessionary<\/span><\/h1><\/div>[vc_column_text]The concessionary for the operation of the Centre Integral de Valoritzaci\u00f3 de Residus del Maresme is the company\u00a0TEM\u00a0<\/strong>(Tractaments Ecol\u00f2gics del Maresme).<\/p>\n

This society was entrusted with the project, the construction and the operation of the new Centre for a period of 15 years on May 18, 2007, through the “Concurs de concessi\u00f3 d’obra p\u00fablica per a l’ampliaci\u00f3, adequaci\u00f3 i explotaci\u00f3 del Centre Integral de Valoritzaci\u00f3 de Residus del Maresme” (Bid for the concession of the public work of enlargement, improvement and operation of the Integrated Centre for Waste Recovery in the Maresme area).<\/p>\n

The distribution of the company shares is as follows:[\/vc_column_text][vc_row_inner content_placement=”middle” css=”.vc_custom_1606758666198{margin-bottom: 30px !important;padding-bottom: 40px !important;background-color: #f9fafc !important;border-radius: 10px !important;}”][vc_column_inner el_class=”percent” width=”1\/3″]

\n\t
\n\t\t
<\/i><\/div>\n\t\t

0<\/h2><\/div>\n\t\t

Valoriza Servicios Medioambientales<\/p>\n\t <\/div>\n\t <\/div>[\/vc_column_inner][vc_column_inner el_class=”percent” width=”1\/3″]

\n\t
\n\t\t
<\/i><\/div>\n\t\t

0<\/h2><\/div>\n\t\t

Veolia Proprete<\/p>\n\t <\/div>\n\t <\/div>[\/vc_column_inner][vc_column_inner el_class=”percent” width=”1\/3″ css=”.vc_custom_1608220041985{border-radius: 5px !important;}”]

\n\t
\n\t\t
<\/i><\/div>\n\t\t

0<\/h2><\/div>\n\t\t

Suris S.L.<\/p>\n\t <\/div>\n\t <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row equal_height=”yes”][vc_column width=”1\/2″][vc_column_text]It is the main objective of the company to develop the management of the Centre with total transparency for the Consorci, the environmental authorities and the population in general.
\nThe work of the staff of almost 100 people covers every aspect necessary to ensure reliable quality management of the Centre.<\/p>\n

UTE TEM is an Associated company of AEVERSU (Spanish Waste Management Companies Assotiation)[\/vc_column_text][\/vc_column][vc_column width=”1\/2″][vc_single_image image=”5748″ img_size=”full” alignment=”center” onclick=”custom_link” img_link_target=”_blank” link=”http:\/\/www.aeversu.org\/index.php\/es\/”][\/vc_column][\/vc_row][vc_row disable_element=”yes”][vc_column]

\n\t\t\t\t

Description of the plant<\/span><\/h1><\/div>[vc_tta_tabs active_section=”1″][vc_tta_section title=”Description of the process” tab_id=”1607940945301-9b40a9c4-7b4b”][vc_column_text]<\/p>\n

Energy Recovery Plant<\/h4>\n

[\/vc_column_text][\/vc_tta_section][vc_tta_section title=”The new Centre” tab_id=”1607940945359-6ae43967-758d”][vc_column_text][\/vc_column_text][vc_row_inner][vc_column_inner width=”1\/2″][\/vc_column_inner][vc_column_inner width=”1\/2″][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][\/vc_tta_tabs][\/vc_column][\/vc_row][vc_row][vc_column]

\n\t\t\t\t

Technical Information<\/span><\/h1><\/div>[\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n

General details<\/h2>\n

[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=”1\/2″][vc_column_text]<\/p>\n

Size of building<\/strong>
\nTotal power<\/strong>
\nConcessionary company<\/strong>
\nConcession time period<\/strong>
\nConcession start date<\/strong><\/p>\n

[\/vc_column_text][\/vc_column][vc_column width=”1\/2″][vc_column_text]<\/p>\n

30,000 m2<\/strong>
\n8,600 kW<\/strong>
\nUTE TEM (Tractaments Ecol\u00f2gics del Maresme)<\/strong>
\n15 years<\/strong>
\n01\/01\/2010<\/strong><\/p>\n

[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n

MBT Plant<\/h2>\n

[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=”1\/2″][vc_column_text]<\/p>\n

Capacity<\/strong>
\nOperation days<\/strong>
\nOperation hours<\/strong>
\nNumber of shifts<\/strong>
\nMaximum hourly capacity<\/strong>
\nMaterial recovery efficiency (paper, glass, metal, plastic, etc.)<\/strong>
\nRecovered organic matter (MOR) <\/strong>
\nMaximum combustible waste<\/strong><\/p>\n

[\/vc_column_text][\/vc_column][vc_column width=”1\/2″][vc_column_text]<\/p>\n

190,000 t\/year<\/strong>
\n249 days\/year<\/strong>
\n15 hours\/day on weekdays<\/strong>
\n2<\/strong>
\n30 t\/h<\/strong>
\n8,5% input<\/strong>
\n40% input <\/strong>
\n55% input<\/strong><\/p>\n

[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n

Waste-to-Energy plant<\/strong><\/h2>\n

[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=”1\/2″][vc_column_text]<\/p>\n

Combustible waste PCI estimate<\/strong>
\nContract treatment capacity<\/strong>
\nNumber of lines<\/strong>
\nCombustion system<\/strong>
\nUnit thermal capacity<\/strong>
\nUnit mechanical capacity (PCI 2,800 kcal\/kg)<\/strong>
\nUnit steam generation ratio<\/strong><\/p>\n

[\/vc_column_text][\/vc_column][vc_column width=”1\/2″][vc_column_text]2.800 Kcal\/kg
\n140.000 t\/a\u00f1o
\n2
\nReverse-acting grate
\n24.000.000 kcal\/h
\n8,57 t\/h
\n30,2 t\/h[\/vc_column_text][\/vc_column][\/vc_row][vc_row css=”.vc_custom_1606753944680{margin-top: 10px !important;}”][vc_column width=”1\/2″][vc_column_text]<\/p>\n

Steam pressure
\n<\/strong>Boiler
\nSuperheater
\nTurbine<\/p>\n

[\/vc_column_text][\/vc_column][vc_column width=”1\/2″ css=”.vc_custom_1606754018649{margin-top: 27px !important;}”][vc_column_text]67 bar
\n62,5 bar
\n61 bar[\/vc_column_text][\/vc_column][\/vc_row][vc_row css=”.vc_custom_1606753944680{margin-top: 10px !important;}”][vc_column width=”1\/2″][vc_column_text]<\/p>\n

Steam temperature
\n<\/strong>Boiler
\nSuperheater
\nTurbine<\/p>\n

[\/vc_column_text][\/vc_column][vc_column width=”1\/2″ css=”.vc_custom_1606754018649{margin-top: 27px !important;}”][vc_column_text]283\u00baC
\n385\u00baC
\n380\u00baC[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=”1\/2″][vc_column_text]<\/p>\n

Gas treatment system<\/strong><\/p>\n

[\/vc_column_text][\/vc_column][vc_column width=”1\/2″][vc_column_text]NOx reduction SNCR (Selective Non Catalytic Reduction) type with urea in combustion chamber
\nSemi-dry absorber
\nDry contact reactor
\nActive carbon injection
\nFabric filters
\nNOx reduction SCR (Selective Catalytic Reduction) type with ammonia[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=”1\/2″][vc_column_text]<\/p>\n

Condensation type<\/strong>
\nGeneration power<\/strong>
\nEnergy production<\/strong>
\nEnergy self-consumption<\/strong>
\nElectricity sold<\/strong>
\nEnergy generation ratio<\/strong><\/p>\n

[\/vc_column_text][\/vc_column][vc_column width=”1\/2″][vc_column_text]Air-cooled condensers
\n13,55 MW (11,25 MW+2,3 MW)
\n115.000 MWh\/a\u00f1o
\n30.000 MWh\/a\u00f1o
\n85.000 MWh\/a\u00f1o
\n820 kWh\/t RSU[\/vc_column_text][\/vc_column][\/vc_row][vc_row disable_element=”yes”][vc_column]

\n\t\t\t\t

Pol\u00edtica de seguridad i prevenci\u00f3n de riesgos laborales<\/span><\/h1><\/div>
Descarga la pol\u00edtica de seguridad y prevenci\u00f3n de riesgos laborales aqu\u00ed (catal\u00e1n)<\/a><\/div>[\/vc_column][\/vc_row][vc_row css=”.vc_custom_1606755143270{margin-top: 50px !important;}”][vc_column]
\n\t\t\t\t

Quality and environment<\/span><\/h1><\/div>
Download our quality and environment statement<\/a><\/div>[vc_row_inner css=”.vc_custom_1606755475183{margin-top: 30px !important;}”][vc_column_inner][vc_column_text]The company has the most demanding quality and environment certificates<\/strong>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row css=”.vc_custom_1606758810866{margin-bottom: 40px !important;}”][vc_column width=”1\/4″]
IQNetES-2018-0092_2021-09-17<\/a><\/div>
IQNetES-2021-0044_2021-12-21<\/a><\/div>[\/vc_column][vc_column width=”1\/4″]
IQNetES-0213-2018_2021-09-17<\/a><\/div>[\/vc_column][vc_column width=”1\/4″]
GA-2018-0092_ES_2021-09-17<\/a><\/div>
GE-2021-0044_ES_2021-12-21<\/a><\/div>[\/vc_column][vc_column width=”1\/4″]
ER-0213-2018_ES_2021-09-17<\/a><\/div>[\/vc_column][\/vc_row][vc_row][vc_column]
\n\t\t\t\t

Results of the project<\/span><\/h1><\/div>[vc_tta_tabs][vc_tta_section title=”Territorial cooperation” tab_id=”1606759259880-748fef82-7280″][vc_column_text]Following the frame agreement signed on May 25, 2006, among the Ag\u00e8ncia de Residus de Catalunya (ARC), the Consorci per a la Gesti\u00f3 dels Residus del Vall\u00e8s Oriental, and the Consorci per al Tractament de RSU del Maresme; the tons of FORM (biowaste collected selectively) generated in Maresme will be treated in the biomethanization and composting plant in Granollers; and a part of the tons of mixed waste from Vall\u00e8s Oriental will be treated in the MBT plant in Matar\u00f3.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=”Slag recovery” tab_id=”1606759320087-f2c57ffa-1119″][vc_column_text]Regarding the solid waste resulting from the process of the Waste-to-Energy plant, the facilities is pioneering in the optimization of the comprehensive cycle of waste management, recovering the total amount of slag obtained at the end of the process.<\/p>\n

Slag or bottom ashes is the main solid waste resulting from the incineration process \u201320% in weight of the furnace input\u2013. The recovery of this subproduct \u2013classified as non special waste\u2013 is made through an authorized waste management facility as established by the regulations Order 15th february 1996 of Generalitat de Catalunya.<\/p>\n

The slag, once mechanically treated and duly matured at the authorized management facility, is recovered under the commercial name \u201cescograva\u201d, so it can be used as a subbase filling in civil works.<\/p>\n

This way, slag stops being a waste from the comprehensive management system, remaining only 2-4% in weight, the flying ashes, which are the only real waste or refuse from the process.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=”Energy recovery” tab_id=”1606759343462-5681e018-c70c”][vc_row_inner][vc_column_inner width=”1\/2″][vc_column_text]The Centre plays an important role in the energy generation and the fight against climate change, since it is one of the main generators of renewable energy in Catalunya, in addition to a referent due to the diversity of its origins:<\/p>\n

Photovoltaic<\/u><\/strong>:<\/strong>\u00a0by means of the biggest photovoltaic cover in the Maresme area; we obtain 400,000 kWh\/year, which represent 160 tCO2\/year saved, equivalent to planting 8,000 trees.<\/p>\n

Anaerobic digestion (biogas)<\/u><\/strong>:<\/strong>\u00a013 milion kWh\/year, which represent 5,000 tCO2\/year saved, equivalent to planting 250,000 trees.[\/vc_column_text][\/vc_column_inner][vc_column_inner width=”1\/2″][vc_single_image image=”6604″ img_size=”full”][\/vc_column_inner][\/vc_row_inner][vc_column_text]Waste-to-Energy plant<\/u><\/strong>:<\/strong>\u00a080 milion kWh\/year, equivalent to the domestic electric consumption of 80,000 people or 30,000 homes.<\/p>\n

Tub Verd (Green Pipe)<\/u>:<\/strong>\u00a0Heat distribution network that uses environmental infrastructures of the city of Matar\u00f3 to prevent the use of fossil fuels, like fuel or natural gas. The Centre sends to this network 7.5 t\/h of steam produced in the Waste-to-Energy plant. This is equivalent to 4 MW of heat.[\/vc_column_text][\/vc_tta_section][vc_tta_section title=”Material recovery” tab_id=”1606759259830-c8141339-5343″][vc_row_inner][vc_column_inner width=”1\/2″][vc_column_text]Around 16,000 tons\/year of materials are recovered in the MBT Plant, specifically in the mechanical pretreatment stage, to be reintroduced into the market as recycled products.<\/p>\n

The materials recovered are: glass, paper\/cardboard, plastic (PET, HDPE, LDPE and mixed plastic), tetra bricks, iron materials and aluminium.<\/p>\n\n\n\n\n\n\n\n\n\n\n\n\n
\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0Material recovered<\/strong><\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0T\/year<\/strong><\/td>\n<\/tr>\n
Paper\/Cardboard<\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 5.785<\/td>\n<\/tr>\n
PET<\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 483<\/td>\n<\/tr>\n
HDPE<\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 394<\/td>\n<\/tr>\n
Mixed plastic<\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 1.429<\/td>\n<\/tr>\n
LDPE<\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 2.715<\/td>\n<\/tr>\n
Tetra bricks<\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 642<\/td>\n<\/tr>\n
Glass<\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 665<\/td>\n<\/tr>\n
Iron materials<\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a03.589<\/td>\n<\/tr>\n
Aluminium<\/td>\n\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 372<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

Thanks to the recovery of these materials, a great deal of natural resources and energy which would otherwise be used to produce these materials can be saved.[\/vc_column_text][\/vc_column_inner][vc_column_inner width=”1\/2″][vc_single_image image=”5802″ img_size=”full”][vc_single_image image=”5805″ img_size=”full”][\/vc_column_inner][\/vc_row_inner][\/vc_tta_section][\/vc_tta_tabs][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"

[vc_row css=”.vc_custom_1606749728342{margin-top: 30px !important;}”][vc_column][\/vc_column][\/vc_row][vc_row][vc_column][vc_tta_accordion][vc_tta_section title=”First Generation: 1985″ tab_id=”1606749602157-29ba1da6-c08c”][vc_column_text]Due to the closure of the landfill in the city of Matar\u00f3 in the 80\u2019s, the city council was faced with the need to provide some alternative treatment system in order to solve the need to manage municipal waste. This is how Matar\u00f3 became the head of the…<\/p>\n","protected":false},"author":1,"featured_media":6461,"parent":6430,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"wpb-page-builder.php","meta":[],"yoast_head":"\nMaresme Integral Centre For Waste Recovery | Maresme Circular<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Maresme Integral Centre For Waste Recovery | Maresme Circular\" \/>\n<meta property=\"og:description\" content=\"[vc_row css=”.vc_custom_1606749728342{margin-top: 30px !important;}”][vc_column][\/vc_column][\/vc_row][vc_row][vc_column][vc_tta_accordion][vc_tta_section title=”First Generation: 1985″ tab_id=”1606749602157-29ba1da6-c08c”][vc_column_text]Due to the closure of the landfill in the city of Matar\u00f3 in the 80\u2019s, the city council was faced with the need to provide some alternative treatment system in order to solve the need to manage municipal waste. This is how Matar\u00f3 became the head of the...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/\" \/>\n<meta property=\"og:site_name\" content=\"Maresme Circular\" \/>\n<meta property=\"article:modified_time\" content=\"2022-01-13T16:38:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maresmecircular.cat\/wp-content\/uploads\/2020\/12\/ctrum-banner.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1435\" \/>\n\t<meta property=\"og:image:height\" content=\"543\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/maresmecircular.cat\/#website\",\"url\":\"https:\/\/maresmecircular.cat\/\",\"name\":\"Maresme Circular\",\"description\":\"Maresme Circular\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/maresmecircular.cat\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/maresmecircular.cat\/wp-content\/uploads\/2020\/12\/ctrum-banner.png\",\"contentUrl\":\"https:\/\/maresmecircular.cat\/wp-content\/uploads\/2020\/12\/ctrum-banner.png\",\"width\":1435,\"height\":543},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#webpage\",\"url\":\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/\",\"name\":\"Maresme Integral Centre For Waste Recovery | Maresme Circular\",\"isPartOf\":{\"@id\":\"https:\/\/maresmecircular.cat\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#primaryimage\"},\"datePublished\":\"2021-01-05T14:38:58+00:00\",\"dateModified\":\"2022-01-13T16:38:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inici\",\"item\":\"https:\/\/maresmecircular.cat\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MARESME CONSORTIUM FOR MUNICIPAL SOLID WASTE TREATMENT\",\"item\":\"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Maresme Integral Centre For Waste Recovery\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Maresme Integral Centre For Waste Recovery | Maresme Circular","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/","og_locale":"en_US","og_type":"article","og_title":"Maresme Integral Centre For Waste Recovery | Maresme Circular","og_description":"[vc_row css=”.vc_custom_1606749728342{margin-top: 30px !important;}”][vc_column][\/vc_column][\/vc_row][vc_row][vc_column][vc_tta_accordion][vc_tta_section title=”First Generation: 1985″ tab_id=”1606749602157-29ba1da6-c08c”][vc_column_text]Due to the closure of the landfill in the city of Matar\u00f3 in the 80\u2019s, the city council was faced with the need to provide some alternative treatment system in order to solve the need to manage municipal waste. This is how Matar\u00f3 became the head of the...","og_url":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/","og_site_name":"Maresme Circular","article_modified_time":"2022-01-13T16:38:46+00:00","og_image":[{"width":1435,"height":543,"url":"https:\/\/maresmecircular.cat\/wp-content\/uploads\/2020\/12\/ctrum-banner.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/maresmecircular.cat\/#website","url":"https:\/\/maresmecircular.cat\/","name":"Maresme Circular","description":"Maresme Circular","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maresmecircular.cat\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#primaryimage","inLanguage":"en-US","url":"https:\/\/maresmecircular.cat\/wp-content\/uploads\/2020\/12\/ctrum-banner.png","contentUrl":"https:\/\/maresmecircular.cat\/wp-content\/uploads\/2020\/12\/ctrum-banner.png","width":1435,"height":543},{"@type":"WebPage","@id":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#webpage","url":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/","name":"Maresme Integral Centre For Waste Recovery | Maresme Circular","isPartOf":{"@id":"https:\/\/maresmecircular.cat\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#primaryimage"},"datePublished":"2021-01-05T14:38:58+00:00","dateModified":"2022-01-13T16:38:46+00:00","breadcrumb":{"@id":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/maresme-integral-centre-for-waste-recovery\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inici","item":"https:\/\/maresmecircular.cat\/en\/"},{"@type":"ListItem","position":2,"name":"MARESME CONSORTIUM FOR MUNICIPAL SOLID WASTE TREATMENT","item":"https:\/\/maresmecircular.cat\/en\/consortium-for-municipal-solid-waste-treatment-of-maresme\/"},{"@type":"ListItem","position":3,"name":"Maresme Integral Centre For Waste Recovery"}]}]}},"_links":{"self":[{"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/pages\/6589"}],"collection":[{"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/comments?post=6589"}],"version-history":[{"count":20,"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/pages\/6589\/revisions"}],"predecessor-version":[{"id":8522,"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/pages\/6589\/revisions\/8522"}],"up":[{"embeddable":true,"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/pages\/6430"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/media\/6461"}],"wp:attachment":[{"href":"https:\/\/maresmecircular.cat\/en\/wp-json\/wp\/v2\/media?parent=6589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}